GENERAL QUALITY ASSURANCE AND QUALITY CONTROL POLICY

· The policy of MAKBERG LTD is that it’s operations are calculated at all time to international standards in such a way that the materials used can withstand the anticipated loads, forces, etc., as stated in the design specification and assurance that materials will be according to standard, and can be tested by clients, if so desired.

· Therefore, MAKBERG STD implements a document procedure system to ensure that execution and quality control procedure are suitably drawn up in order to meet the construction quality requirements, in compliance with the contract document. Execution and quality control procedures are made available to the relevant recipient.

· Latest issues of all applicable drawing and documents are used at all stages of the construction, and obsolete drawing and documents are withdrawn. All activities are performed according to the relevant execution procedure; responsibility for each control task is clearly identified.

· Defined verification is made at every stage of the construction, in such a way that no stage can be started without the previous one having been verified. Verification is recorded in the specified manner; the quality assurance authority compiling construction quality control file centralizes verification.



bottom of page